{"id":3246,"date":"2026-11-13T04:52:55","date_gmt":"2026-11-13T04:52:55","guid":{"rendered":"https:\/\/cairunhometextiles.com\/home-textile-first-order-program\/"},"modified":"2026-11-14T15:23:23","modified_gmt":"2026-11-14T15:23:23","slug":"home-textile-first-order-program","status":"publish","type":"page","link":"https:\/\/cairunhometextiles.com\/de\/home-textile-first-order-program\/","title":{"rendered":"Programm f\u00fcr die erste Heimtextil-Bestellung"},"content":{"rendered":"<style>\n.crp-pillar { max-width: 1280px; margin: 0 auto; padding: 40px 48px; }\n.crp-pillar .pillar-hero { background: linear-gradient(135deg, #3F362B 0%, #3F362B 100%); color: #fff; padding: 48px; border-radius: 16px; margin-bottom: 40px; text-align: center; }\n.crp-pillar .pillar-hero h1 { font-size: 2.2rem; font-weight: 800; margin: 0 0 14px; color: #fff; }\n.crp-pillar .pillar-hero p { font-size: 1.05rem; color: #D9D0C7; max-width: 760px; margin: 0 auto; line-height: 1.7; }\n.crp-pillar .pillar-hero .eyebrow { display: inline-block; font-size: 0.82rem; font-weight: 700; text-transform: uppercase; letter-spacing: 0.1em; color: #fff; background: rgba(123,106,88,0.85); padding: 5px 14px; border-radius: 20px; margin-bottom: 16px; }\n.crp-pillar .pillar-hero .hero-cta { margin-top: 22px; }\n.crp-pillar .pillar-hero .hero-cta a { display: inline-block; padding: 11px 26px; border-radius: 8px; text-decoration: none; font-weight: 700; margin: 6px 6px 0; font-size: 0.95rem; }\n.crp-pillar .pillar-hero .hero-cta a.pri { background: #7B6A58; color: #fff; }\n.crp-pillar .pillar-hero .hero-cta a.sec { background: rgba(255,255,255,0.12); color: #fff; border: 1px solid rgba(255,255,255,0.5); }\n.crp-pillar h2 { font-size: 1.6rem; font-weight: 800; color: #2A241E; margin: 44px 0 18px; padding-bottom: 10px; border-bottom: 3px solid #BCAD9D; }\n.crp-pillar h3 { font-size: 1.2rem; font-weight: 700; color: #2A241E; margin: 28px 0 12px; }\n.crp-pillar p { font-size: 1rem; line-height: 1.75; color: #4A4034; margin: 0 0 16px; }\n.crp-pillar a { color: #6B5E4E; text-decoration: underline; text-decoration-color: #BCAD9D; text-underline-offset: 2px; font-weight: 600; }\n.crp-pillar a:hover { color: #4A4034; text-decoration-color: #7B6A58; }\n.crp-pillar table { width: 100%; border-collapse: collapse; margin: 20px 0 28px; font-size: 0.92rem; }\n.crp-pillar table thead th { background: #3F362B; color: #fff; font-weight: 700; text-align: left; padding: 12px 14px; }\n.crp-pillar table tbody td { padding: 12px 14px; border-bottom: 1px solid #D3CAC1; vertical-align: top; }\n.crp-pillar table tbody tr:nth-child(even) { background: #FAF8F4; }\n.crp-pillar ul, .crp-pillar ol { margin: 0 0 16px 1.4em; color: #4A4034; line-height: 1.7; }\n.crp-pillar li { margin-bottom: 8px; }\n.crp-pillar .qa { background: #FAF8F4; border-left: 4px solid #BCAD9D; padding: 18px 22px; border-radius: 8px; margin: 0 0 24px; }\n.crp-pillar .qa p { margin: 0; font-size: 1rem; }\n.crp-pillar .cta-box { background: #FAF8F4; border: 1px solid #D3CAC1; border-left: 5px solid #BCAD9D; padding: 28px 32px; border-radius: 10px; margin: 40px 0; }\n.crp-pillar .cta-box h3 { margin-top: 0; color: #4A4034; }\n.crp-pillar .cta-box a.btn { display: inline-block; background: #7B6A58; color: #fff; padding: 12px 28px; border-radius: 8px; text-decoration: none; font-weight: 700; margin-right: 12px; }\n.crp-pillar .cta-box a.btn.alt { background: #fff; color: #6B5E4E; border: 2px solid #BCAD9D; }\n.crp-pillar details { background: #FAF8F4; border: 1px solid #D3CAC1; border-radius: 8px; padding: 14px 18px; margin: 0 0 12px; }\n.crp-pillar details summary { font-weight: 700; color: #2A241E; cursor: pointer; }\n.crp-pillar details p { margin: 10px 0 0; font-size: 0.95rem; }\n.crp-pillar .resource-grid { display: grid; grid-template-columns: repeat(auto-fill, minmax(280px, 1fr)); gap: 16px; margin: 20px 0; }\n.crp-pillar .resource-card { background: #fff; border: 1px solid #D3CAC1; border-radius: 10px; padding: 18px; box-shadow: 0 1px 3px rgba(0,0,0,0.06); }\n.crp-pillar .resource-card h4 { margin: 0 0 8px; font-size: 1rem; color: #2A241E; }\n.crp-pillar .resource-card p { font-size: 0.9rem; margin: 0 0 10px; }\n.crp-pillar .resource-card a { color: #6B5E4E; text-decoration: none; font-weight: 600; }\n.crp-pillar .resource-card a:hover { text-decoration: underline; }\n.crp-pillar .fact-strip { display: grid; grid-template-columns: repeat(auto-fit, minmax(180px, 1fr)); gap: 14px; margin: 22px 0 30px; }\n.crp-pillar .fact-strip div { background: #FAF8F4; border: 1px solid #D3CAC1; border-radius: 10px; padding: 16px 18px; text-align: center; }\n.crp-pillar .fact-strip strong { display: block; font-size: 1.5rem; color: #4A4034; line-height: 1.2; }\n.crp-pillar .fact-strip span { display: block; font-size: 0.82rem; color: #7B6A58; margin-top: 6px; text-transform: uppercase; letter-spacing: 0.06em; }\n@media (max-width: 768px) { .crp-pillar { padding: 24px 20px; } .crp-pillar .pillar-hero { padding: 32px 20px; } .crp-pillar .pillar-hero h1 { font-size: 1.7rem; } .crp-pillar h2 { font-size: 1.35rem; } }\n.crp-pillar .spec-list { background:#fff; border:1px solid #D3CAC1; border-radius:10px; padding:20px 24px; margin:0 0 22px; }\n.crp-pillar .spec-list h3 { margin-top:0; }\n.crp-pillar .spec-list dl { display:grid; grid-template-columns: minmax(140px, 0.9fr) 2fr; gap:8px 18px; margin:0; }\n.crp-pillar .spec-list dt { font-weight:700; color:#4A4034; font-size:0.93rem; }\n.crp-pillar .spec-list dd { margin:0; color:#4A4034; font-size:0.93rem; line-height:1.6; }\n.crp-pillar .note { background:#fff7ed; border-left:4px solid #ea9010; padding:14px 18px; border-radius:8px; margin:0 0 22px; }\n.crp-pillar .note p { margin:0; font-size:0.95rem; }\n.crp-pillar .link-grid { display:grid; grid-template-columns:repeat(auto-fill, minmax(250px,1fr)); gap:14px; margin:18px 0 26px; }\n.crp-pillar .link-grid a { display:block; background:#fff; border:1px solid #D3CAC1; border-radius:10px; padding:16px 18px; text-decoration:none; color:#2A241E; font-weight:700; font-size:0.95rem; }\n.crp-pillar .link-grid a span { display:block; font-weight:400; color:#7B6A58; font-size:0.86rem; margin-top:4px; }\n.crp-pillar .link-grid a:hover { border-color:#BCAD9D; }\n.crp-pillar .tag-row { margin:0 0 20px; }\n.crp-pillar .tag-row em { display:inline-block; font-style:normal; background:#FAF8F4; color:#4A4034; border:1px solid #D3CAC1; border-radius:20px; padding:4px 12px; font-size:0.83rem; margin:0 6px 6px 0; }\n@media (max-width:768px) {\n  .crp-pillar .spec-list dl { grid-template-columns:1fr; }\n  .crp-pillar .spec-list dt { margin-top:8px; }\n}\n<\/style><style>\/* crp-tblwrap-base *\/.crp-pillar .crp-tblwrap{overflow-x:auto;-webkit-overflow-scrolling:touch;margin:20px 0 28px;max-width:100%}.crp-pillar .crp-tblwrap>table{width:100%;min-width:520px;margin:0}.crp-pillar .crp-tblwrap::-webkit-scrollbar{height:6px}.crp-pillar .crp-tblwrap::-webkit-scrollbar-thumb{background:#EFE9DF;border-radius:3px}\n\n\n:where(.crp-pillar, .crp-home, .entry-content, .wp-block-post-content) :where(a:not(.nav-cta):not(.sec):not(.footer-logo):not(.nav-link):not(.pri):not(.btn):not(.button)) { color: #6B5E4E; text-decoration: underline; text-decoration-color: #BCAD9D; text-underline-offset: 2px; }\n:where(.crp-pillar, .crp-home, .entry-content, .wp-block-post-content) :where(a:not(.nav-cta):not(.sec):not(.footer-logo):not(.nav-link):not(.pri):not(.btn):not(.button)):hover { color: #3F362B; text-decoration-color: #7B6A58; }\n.site-footer a, .site-footer a.footer-logo { color: #E8E1D6; }\n.site-footer a:hover { color: #FFFFFF; }\n<\/style><div class=\"crp-pillar\"><div class=\"pillar-hero\">\n  <span class=\"eyebrow\">Procurement &middot; First Purchase Order &middot; Risk Structure<\/span>\n  <h1>A First Home Textile Order: How to Structure It So the Risk Stays Manageable<\/h1>\n  <p>A first order is not a smaller version of a regular order. It carries two risks a repeat order does not have: the specification has never been produced before, and the working relationship has never been tested. Both can be handled, but only if they are handled deliberately in the purchase order rather than discovered during delivery. This page sets out how to size a first order, which terms belong in the PO, and which mistakes are worth avoiding even at the cost of a slower start.<\/p>\n  <div class=\"hero-cta\"><a class=\"pri\" href=\"\/contact-us\/\">Structure a first order<\/a><a class=\"sec\" href=\"\/low-moq-custom-home-textiles\/\">Read the MOQ tiers<\/a><\/div>\n<\/div><h2>1. The Two Risks a First Order Carries<\/h2><div class=\"qa\"><p><strong>In one paragraph:<\/strong> A first home textile order should be sized at the lowest MOQ tier that proves the item &mdash; 100 pieces per design, per colourway, per size &mdash; rather than the tier with the better unit price. The purchase order should state the approved sample reference, the finished dimensions with their tolerance, the fabric and print method, the packing format, the inspection approach, the payment split (30% T\/T deposit, 70% balance before shipment) and the trade term (EXW, FOB, CIF or DAP from Ningbo). Production runs 15&ndash;25 days for regular bulk and 25&ndash;35 days where custom printing, complex packing or new development applies, counted from sample or specification approval plus deposit received.<\/p><\/div><div class=\"fact-strip\"><div><strong>6,000 m&sup2;<\/strong><span>Factory area<\/span><\/div><div><strong>10<\/strong><span>Production lines<\/span><\/div><div><strong>17<\/strong><span>Product categories<\/span><\/div><div><strong>1.6 m<\/strong><span>Max print width<\/span><\/div><\/div><p>Every first order carries a specification risk and a relationship risk, and they are managed differently.<\/p><ul><li><strong>Specification risk<\/strong> is that the produced goods do not match what the buyer thought was agreed. It is managed by writing the specification down and approving a physical sample against it.<\/li><li><strong>Relationship risk<\/strong> is that the working practice &mdash; how quickly questions are answered, how a problem is raised, who owns a decision &mdash; is not what either side assumed. It is managed by keeping the first order small enough that a mismatch is survivable.<\/li><\/ul><p>The mistake that combines both is placing a large first order for an item that has never been produced. The unit price looks better, and the exposure is the entire commitment at once.<\/p><h2>2. Sizing a First Order<\/h2><p>The size of a first order should be set by what it needs to prove, not by the price break it can reach.<\/p><div class=\"crp-tblwrap\"><table><thead><tr><th>What the first order is proving<\/th><th>Appropriate size<\/th><th>Why not larger<\/th><\/tr><\/thead><tbody><tr><td>Whether the item can be made to the specification at all<\/td><td>One SKU at 100 pieces<\/td><td>A specification failure at 1,000 pieces is a write-off, not a lesson<\/td><\/tr><tr><td>Whether the item sells<\/td><td>One SKU at 100 pieces, or a small colourway set at 300<\/td><td>Colour performance is a market question, not a production one<\/td><\/tr><tr><td>Whether the packing suits the channel<\/td><td>One SKU at 100 pieces in the intended packing<\/td><td>Packing problems appear at fulfilment, not at inspection<\/td><\/tr><tr><td>Whether the relationship works<\/td><td>One or two SKUs at 100 pieces each<\/td><td>A first order is also a trial of the working practice<\/td><\/tr><\/tbody><\/table><\/div><p>The 100-piece tier exists for this purpose. Ordering at 300 or 500 pieces on a first item is a decision to accept more exposure in exchange for a lower unit price &mdash; which is legitimate once the item is proven, and premature before it is.<\/p><h2>3. What Belongs in the Purchase Order<\/h2><p>A PO that references a sample and a price is not a specification. The clauses below are what turn an order into an enforceable description of the goods.<\/p><div class=\"crp-tblwrap\"><table><thead><tr><th>Clause<\/th><th>What it should contain<\/th><th>What goes wrong without it<\/th><\/tr><\/thead><tbody><tr><td>Sample reference<\/td><td>The approved sample, dated, with the approval recorded in writing<\/td><td>The goods match a sample that nobody can produce or that was later modified<\/td><\/tr><tr><td>Dimensions and tolerance<\/td><td>Finished size plus the tolerance band for that category<\/td><td>A size dispute is settled by opinion instead of a number<\/td><\/tr><tr><td>Fabric and weight band<\/td><td>The reference and the band<\/td><td>A substitute changes hand and print behaviour<\/td><\/tr><tr><td>Print method and artwork<\/td><td>The method, plus the approved artwork file and colour reference<\/td><td>The result is plausible but off the approval<\/td><\/tr><tr><td>Packing format<\/td><td>Bag, set count, label position, barcode, carton mark<\/td><td>The delivery cannot be received into the intended channel<\/td><\/tr><tr><td>Inspection approach<\/td><td>Whether AQL 2.5 Level II applies, or third-party inspection<\/td><td>Acceptance criteria are invented at the end<\/td><\/tr><tr><td>Payment split<\/td><td>30% T\/T deposit, 70% balance before shipment<\/td><td>Ambiguity about when production starts<\/td><\/tr><tr><td>Trade term and port<\/td><td>EXW, FOB, CIF or DAP; loading at Ningbo<\/td><td>Cost responsibility is unclear at the worst moment<\/td><\/tr><tr><td>Production band<\/td><td>15&ndash;25 days regular, 25&ndash;35 days custom or new development<\/td><td>A delivery date is assumed rather than agreed<\/td><\/tr><\/tbody><\/table><\/div><p>Note what is not in the list: a delivery date. The bands are production durations, and the shipment date follows from them plus the chosen trade term and route. Writing a calendar date into a first PO before sample approval is how a schedule becomes a dispute.<\/p><h2>4. Payment, Trade Terms and What They Actually Allocate<\/h2><p>Two clauses do most of the risk allocation, and both are frequently misunderstood on a first order.<\/p><p><strong>The 30\/70 split<\/strong> means 30% T\/T with the order and 70% before shipment. The deposit is not a reservation fee; it is one of the two conditions that start the production clock, the other being written sample or specification approval. A PO issued before the deposit clears does not start production.<\/p><p><strong>The trade term<\/strong> decides where the buyer&rsquo;s cost and risk begin. EXW places it at the factory, FOB at the port of loading, CIF at the destination port, and DAP at the named destination with duties still with the buyer. DDP is not offered, so a first-order budget that assumes delivered duty-paid cost has to be rebuilt around one of the four terms above.<\/p><p>The practical consequence for a first order is that the landed cost is a calculation the buyer makes from a known trade term, not a number the supplier should be asked to guarantee. Asking for a delivered price means asking for a different trade term, and only four are available.<\/p><div class=\"note\"><p><strong>Fact boundary:<\/strong> No price, unit cost, freight rate, duty rate or percentage saving figure is published here. Pricing is quoted per requirement against the confirmed specification. This page describes how a first order is structured, not what it costs.<\/p><\/div><h2>5. Inspection on a First Order<\/h2><p>Inspection matters more on a first order than on a repeat, because there is no history to compare against. Two arrangements are available.<\/p><ul><li><strong>Factory inspection<\/strong> covering colour and appearance comparison against the approved sample, print defect inspection, sewing and workmanship, dimensional consistency, packing integrity and count, and pre-shipment sampling per project.<\/li><li><strong>Third-party inspection<\/strong> coordinated on the buyer&rsquo;s request at the buyer&rsquo;s cost, typically within about 5&ndash;10 business days depending on the agency and the project. Buyer-nominated agencies can be accommodated.<\/li><\/ul><p>AQL 2.5 Level II can be applied when a specific project requires and agrees it. It is not the default standard for every order, so a first PO that states it as though it were universal creates an expectation the inspection plan was never designed to meet. The scope and acceptance points are agreed per project and set out on the <a href=\"\/home-textile-quality-control\/\">quality control page<\/a>.<\/p><h2>6. What to Avoid on a First Order<\/h2><ul><li><strong>Ordering a category you have not specified.<\/strong> If the item has never been described in writing, the first order is also the first specification.<\/li><li><strong>Combining a first item with a large second item to get to a price break.<\/strong> The second item inherits the first one&rsquo;s unproven risk.<\/li><li><strong>Leaving packing until after production.<\/strong> Packing interacts with dimensions, and a late packing change can invalidate an approved size.<\/li><li><strong>Assuming a delivery date.<\/strong> The bands are durations; the shipment date follows from them and the trade term.<\/li><li><strong>Skipping written approval.<\/strong> A sample that was seen and liked has not closed the specification, so the clock has not started.<\/li><\/ul><h2>7. Related Pages<\/h2><div class=\"link-grid\"><a href=\"\/low-moq-custom-home-textiles\/\">Low MOQ Custom Home Textiles<span>Tiers, and how MOQ is counted<\/span><\/a><a href=\"\/how-to-order-custom-home-textiles\/\">How to Order Custom Home Textiles<span>The eight-stage order flow<\/span><\/a><a href=\"\/home-textile-sample-to-stock-program\/\">Home Textile Sample to Stock<span>What to lock at approval for reorders<\/span><\/a><a href=\"\/home-textile-multi-category-order-program\/\">Multi-Category Order Program<span>Ordering several categories in one PO<\/span><\/a><a href=\"\/home-textile-supplier-comparison-program\/\">Supplier Comparison Program<span>How to compare quotes on like terms<\/span><\/a><a href=\"\/home-textile-quality-control\/\">Home Textile Quality Control<span>Inspection scope and acceptance points<\/span><\/a><\/div><h2>8. Frequently Asked Questions<\/h2><details><summary>How large should a first home textile order be?<\/summary><p>One SKU at the lowest MOQ tier of 100 pieces is the usual answer, because it proves the item at the smallest exposure. Ordering at 300, 500 or 1,000 pieces on a first item accepts more risk in exchange for a lower unit price, which is reasonable once the specification is proven and premature before.<\/p><\/details><details><summary>What must be in a first purchase order?<\/summary><p>The approved sample reference, finished dimensions with tolerance, fabric and weight band, print method and artwork, packing format, inspection approach, payment split, trade term and port, and the production band. Not a calendar delivery date &mdash; that follows from the band plus the trade term.<\/p><\/details><details><summary>What are the payment terms?<\/summary><p>30% T\/T deposit with the order and 70% balance before shipment. The deposit is one of the two conditions that start the production clock, alongside written sample or specification approval. A PO issued before the deposit clears does not start production.<\/p><\/details><details><summary>Which trade terms are available?<\/summary><p>EXW, FOB, CIF and DAP, loading at Ningbo. DDP is not offered. Each term places the buyer&rsquo;s cost and risk at a different point, so the landed cost is calculated from the chosen term rather than requested as a delivered figure.<\/p><\/details><details><summary>Is inspection included on a first order?<\/summary><p>Factory inspection covers colour and appearance against the approved sample, print defects, sewing and workmanship, dimensional consistency, packing integrity and count, plus pre-shipment sampling per project. Third-party inspection can be arranged at the buyer&rsquo;s request and cost, typically within about 5&ndash;10 business days.<\/p><\/details><details><summary>Can I get a lower unit price by ordering more on the first order?<\/summary><p>Yes, the tier structure means a larger quantity carries a lower unit price. Whether that is a good trade on a first order depends on how much unproven exposure the item carries &mdash; and no percentage saving figure is quoted here, because the unit price is quoted per requirement.<\/p><\/details><div class=\"cta-box\"><h3>Structure a first order<\/h3><p>Send the item you intend to order first, the reference or artwork, the target dimensions, the quantity you are considering and the channel the goods are going into. The reply will state the tier the plan lands in, the production band, and which specification items still need to be closed before a PO is workable. Initial enquiries are answered within 12 business hours.<\/p><a class=\"btn\" href=\"\/contact-us\/\">Structure my first order<\/a><a class=\"btn alt\" href=\"\/low-moq-custom-home-textiles\/\">Read the MOQ guide<\/a><\/div><!-- crp-related-v3f --><h2>Related: running a supply program<\/h2><p>Program-level pages for buyers who order the same range repeatedly rather than placing a single one-off order.<\/p><div class=\"link-grid\"><a href=\"\/home-textile-kitchen-utility-bundle\/\">Kitchen &amp; Utility Textiles<span>Aprons, sets and front-of-house ordering<\/span><\/a><a href=\"\/home-textile-hospitality-venue-program\/\">Hospitality &amp; Venue Sets<span>Specifying a property room type by room type<\/span><\/a><\/div><script type=\"application\/ld+json\">\n{\"@context\":\"https:\/\/schema.org\",\"@type\":\"Service\",\n \"name\":\"Home Textile First Order Program\",\n \"serviceType\":\"Home Textile First Order Structuring\",\n \"provider\":{\"@type\":\"Organization\",\"name\":\"Cairun Home Textiles\",\"legalName\":\"\u4e0a\u9976\u5e02\u5f69\u6da6\u5bb6\u7eba\u6709\u9650\u516c\u53f8\",\"url\":\"https:\/\/cairunhometextiles.com\/\"},\n \"areaServed\":[\"North America\",\"Europe\",\"Australia\",\"Southeast Asia\"],\n \"description\":\"How to structure a first home textile purchase order: sizing at the 100-piece tier, the clauses that belong in the PO, payment split, trade terms from Ningbo, and inspection scope.\"}\n<\/script><script type=\"application\/ld+json\">\n{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"How large should a first home textile order be?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"One SKU at the lowest MOQ tier of 100 pieces is the usual answer, because it proves the item at the smallest exposure. Ordering at 300, 500 or 1,000 pieces on a first item accepts more risk in exchange for a lower unit price, which is reasonable once the specification is proven and premature before.\"}}, {\"@type\": \"Question\", \"name\": \"What must be in a first purchase order?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The approved sample reference, finished dimensions with tolerance, fabric and weight band, print method and artwork, packing format, inspection approach, payment split, trade term and port, and the production band. Not a calendar delivery date &mdash; that follows from the band plus the trade term.\"}}, {\"@type\": \"Question\", \"name\": \"What are the payment terms?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"30% T\/T deposit with the order and 70% balance before shipment. The deposit is one of the two conditions that start the production clock, alongside written sample or specification approval. A PO issued before the deposit clears does not start production.\"}}, {\"@type\": \"Question\", \"name\": \"Which trade terms are available?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"EXW, FOB, CIF and DAP, loading at Ningbo. DDP is not offered. Each term places the buyer&rsquo;s cost and risk at a different point, so the landed cost is calculated from the chosen term rather than requested as a delivered figure.\"}}, {\"@type\": \"Question\", \"name\": \"Is inspection included on a first order?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Factory inspection covers colour and appearance against the approved sample, print defects, sewing and workmanship, dimensional consistency, packing integrity and count, plus pre-shipment sampling per project. Third-party inspection can be arranged at the buyer&rsquo;s request and cost, typically within about 5&ndash;10 business days.\"}}, {\"@type\": \"Question\", \"name\": \"Can I get a lower unit price by ordering more on the first order?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes, the tier structure means a larger quantity carries a lower unit price. Whether that is a good trade on a first order depends on how much unproven exposure the item carries &mdash; and no percentage saving figure is quoted here, because the unit price is quoted per requirement.\"}}]}\n<\/script><script type=\"application\/ld+json\">\n{\"@context\": \"https:\/\/schema.org\", \"@type\": \"BreadcrumbList\", \"itemListElement\": [{\"@type\": \"ListItem\", \"position\": 1, \"name\": \"Home\", \"item\": \"https:\/\/cairunhometextiles.com\/\"}, {\"@type\": \"ListItem\", \"position\": 2, \"name\": \"Home Textile First Order Program\"}]}\n<\/script><\/div>","protected":false},"excerpt":{"rendered":"Procurement &middot; First Purchase Order &middot; Risk Structure A First Home Textile Order: How to Structure It So the Risk Stays Manageable A first order is not a smaller version of a regular order. It carries two risks a repeat order does not have: the specification has never been produced before, and the working relationship [&hellip;]","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-3246","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/cairunhometextiles.com\/de\/wp-json\/wp\/v2\/pages\/3246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cairunhometextiles.com\/de\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cairunhometextiles.com\/de\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cairunhometextiles.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cairunhometextiles.com\/de\/wp-json\/wp\/v2\/comments?post=3246"}],"version-history":[{"count":5,"href":"https:\/\/cairunhometextiles.com\/de\/wp-json\/wp\/v2\/pages\/3246\/revisions"}],"predecessor-version":[{"id":3527,"href":"https:\/\/cairunhometextiles.com\/de\/wp-json\/wp\/v2\/pages\/3246\/revisions\/3527"}],"wp:attachment":[{"href":"https:\/\/cairunhometextiles.com\/de\/wp-json\/wp\/v2\/media?parent=3246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}