Commercial Program · First Range · Launch Sequence

Home Textile Brand Launch: A First-Range Route From Nothing to a First Order

A first range fails for predictable reasons, and none of them is the design. It fails because too many categories were attempted at once, because the MOQ was committed before the assortment was tested, or because a label was specified before there was a product to put it on. This page sets out the order in which those decisions are worth making, what a realistic first range looks like, and where a launch budget actually goes.

1. Why a First Range Usually Fails

In one paragraph: A first home textile range is more reliable when built in three moves: choose one or two categories rather than the whole range, commit to one specimen SKU per category at the 100-piece MOQ tier, and add your own label only once the product and the packing are settled. Standard samples are 5–7 days and custom print or custom size samples 7–10 days; regular bulk is 15–25 days and custom printing, complex packing or new development 25–35 days, both counted from sample or specification approval plus deposit received. MOQ is per design, per colourway, per size, so the number of SKUs you choose sets the budget far more than the unit price does.

6,000 m²Factory area
10Production lines
17Product categories
1.6 mMax print width

Three failure patterns account for most first-range problems, and all three come from the same instinct — to look like an established brand on day one.

  • Too many categories. A lookbook with table linen, bedding, bath and wall decor reads as a brand. It also means four MOQ commitments, four specification documents and four sample rounds before anything sells.
  • MOQ committed before the assortment is tested. MOQ is per design, per colourway, per size. Ten SKUs at the 100-piece tier is a thousand units, and that is a decision on inventory, not on design.
  • The label specified before the product. A woven label, a printed care label, a hang tag and a branded polybag all attach to a finished item. Specifying them first locks the packing before the dimensions are settled.

2. The Order Worth Following

The sequence below is arranged so that each step can be abandoned cheaply if the previous one changes the plan.

StepDecisionWhat it costs if you change it later
1Choose one or two categories, not fourNothing — this is a paper decision
2Choose the specimen SKU in each categoryNothing until a sample is ordered
3Sample the specimen and settle construction, size and finishOne extra sample round (5–7 or 7–10 days)
4Place your label and packing on the settled itemA packing change after bulk starts affects cartons already produced
5Place the first bulk order at the tier the assortment justifiesMOQ is a commitment, not a target
6Test sell-through, then extend the rangeA second order is cheaper to change than the first is to cancel

Steps 1 and 2 are free, which is the reason to do them properly. A buyer who spends a week on the paper decision avoids spending a sample round discovering that four categories cannot be launched together.

3. What a Realistic First Range Looks Like

Two categories, one specimen each, is a launch. Three or four categories with one item each is also a launch, provided the MOQ math is understood before the enquiry rather than after the quotation.

StructureSKUsUnits at the 100-piece tierWhat it tests
One category, one design, one colourway1100Whether the product sells at all
One category, one design, three colourways3300Whether colour drives the choice
Two categories, one specimen each, two colourways4400Whether the categories belong together
Four categories, one specimen each4400Whether the range reads as one brand — at four separate specification documents

The third row is usually the useful one for a first launch: it produces a small coordinated set, and it tests the question a first range is really asking — do these items belong in the same shop. The fourth row costs the same in units but four times the specification work, which is why it is a poor first move.

Fact boundary: No launch budget, unit cost, retail price, margin or sell-through rate is published here. Pricing is quoted per requirement against the confirmed specification, and no percentage saving figure is offered. The structure above is about how many MOQ commitments a plan creates, not about what it costs.

4. When to Put Your Label On

Label placement is a packing decision, and packing decisions attach to a settled product. Putting the label on first forces the product to fit the label rather than the other way round.

By the time the label is specified, four things should already be fixed: the construction, the finished dimensions with tolerance, the fabric, and the packing format. With those settled, a label is an addition — woven or printed, sewn or attached, with a care label position and a hang tag placement. Without them, a label change can invalidate a size that was already approved.

The mechanics of private labelling — what the label options are, where they attach, and how a label differs from a brand-owned product — are covered on the private label guide. This page is only about when in the sequence it belongs.

5. What to Send in the First Enquiry

A first enquiry that produces a usable quotation contains six items. Missing any one of them usually produces a reply that asks for it, which costs a round trip.

  • Categories. Which one or two, named from the confirmed range rather than described in general terms.
  • The specimen item. A reference image, a sketch, or a physical sample you are matching.
  • Target dimensions, and whether they are fixed or negotiable.
  • Print intent. Whether the item carries artwork, a logo, or is plain — this alone decides between the two production bands.
  • Colourways and the intended SKU count. This is what the MOQ calculation depends on.
  • Timing. When you want stock in hand, not when you want to order. A season, a market date or a launch date is enough.

With those six, the reply can state the MOQ tier the assortment lands in, which production band applies, and whether a sample round is needed before the first bulk order. That is a plan. Without them, the reply can only be a price list.

6. Related Pages

7. Frequently Asked Questions

How many SKUs should a first home textile range have?

One to four, depending on whether the aim is to test a product or to test a look. One category with one design in three colourways gives three SKUs and 300 units at the 100-piece tier, which tests whether colour drives choice. Four categories with one item each costs the same in units but requires four specification documents.

What is the minimum order for a first order?

MOQ starts at 100 pieces per design, per colourway, per size. The tier structure runs 100, 300, 500 and 1,000 pieces, with the unit price reflecting the tier. Because MOQ is counted per design and per colourway, the number of SKUs in your plan determines the total units far more than the tier does.

Can I put my own label on a first order?

Yes, once the product and the packing are settled. Specify the construction, dimensions with tolerance, fabric and packing format first, then add the label. Doing it the other way round means the label constrains the product, and a late packing change can invalidate an approved dimension.

How long does a first order take?

Standard samples take 5–7 days and custom print or custom size samples 7–10 days. Regular bulk is 15–25 days and custom printing, complex packing or new development 25–35 days. All count from sample or specification approval plus deposit received, whichever completes later — so a first order with a custom-printed item is normally a sample round plus a longer production band.

Do you offer a launch package or a starter kit?

No pre-built package is published, because a first range is defined by the categories and SKU count a buyer chooses rather than by a fixed bundle. What is fixed is the MOQ tier structure and the two production bands, and a plan is quoted against those once the categories and SKU count are known.

Is a minimum quantity required per colourway?

Yes. MOQ is counted per design, per colourway, per size, so a three-colourway launch is three MOQ commitments rather than one. That is the single most useful number to calculate before approaching a supplier.

Plan a first range

Send the categories you are considering, the reference for the specimen item, the intended SKU count and colourways, and the date you want stock in hand. The reply will state the MOQ tier that plan lands in, the production band that applies, and whether a sample round is needed before the first bulk order. Initial enquiries are answered within 12 business hours.

Plan my first rangeRead the MOQ guide

Related: buying structure

How a purchase order is structured, what to lock for reorders, how quotes are normalised, and how a multi-category order is sequenced.

Related: running a supply program

Program-level pages for buyers who order the same range repeatedly rather than placing a single one-off order.