Contract Supply of Home Textiles: How a Framework Order Works Across Multiple Batches

A framework contract is not a large order. It is an agreement that describes what will be ordered, in what specification, at what quantity basis and on what terms — with the individual batches released against it later. The difference matters, because almost every clause that would be negotiated once on a single order has to be negotiated in the framework instead, and a framework that leaves them open transfers the same negotiation to every batch.

1. A Framework Is a Set of Fixed Decisions, Not a Volume

In one paragraph: Contract supply works as a framework that fixes the specification, the quantity basis, the trade term, the payment split and the production band, with individual batches released against it. The specification is locked once at approval, so each batch is a repeat rather than a new development. MOQ still applies per batch per design, per colourway, per size, at the 100, 300, 500 or 1,000 piece tiers, and each batch runs in the 15–25 day regular band or the 25–35 day band where custom printing, complex packing or new development applies, counted from approval plus deposit received.

6,000 m²Factory area
10Production lines
17Product categories
1.6 mMax print width

The useful way to read a framework contract is as a list of things that stop being renegotiated. If a clause is not in the framework, it is re-negotiated at every batch release, which defeats the purpose of having one.

Fixed in the frameworkReleased per batch
The specification: construction, dimensions with tolerance, fabric, print method, packingThe quantity for that batch
The trade term and loading portThe shipment date for that batch
The payment splitThe deposit and balance dates for that batch
The production band that appliesThe release date that starts the band
The inspection approach and acceptance pointsThe inspection booking for that batch
How MOQ is countedThe mix of designs, colourways and sizes in that batch

Read the right-hand column: every item on it is a date or a quantity. That is what a batch release should be — two variables, not a negotiation.

2. Why the Specification Has to Close Before the Framework Does

A framework signed against an open specification is not a framework. It is an agreement to agree, and the first batch becomes the real negotiation.

Six parameters have to be written down at approval: construction, finished dimensions with tolerance, base fabric and weight band, print or decoration method with the approved artwork, edge and finish treatment, and packing format. With all six fixed, a batch release needs no specification discussion and the item behaves as a repeat order, which is what makes multi-batch supply predictable at all.

Where any of the six changes, that batch is not a repeat. It needs a sample round, and if the change touches construction, fabric or method it moves to the 25–35 day new-development band. The distinction is set out on the sample to stock page.

3. How Batches Are Scheduled Against the Bands

Two bands govern batch scheduling, and both start from a date rather than from the contract signature.

BandApplies whenStarts from
15–25 daysRegular bulk, specification lockedBatch release plus deposit received
25–35 daysCustom printing, complex packing, or new developmentApproval plus deposit received
5–7 daysStandard sampleSample request against a written specification
7–10 daysCustom print or custom size sampleThe same, where the sample itself is customised

On a locked specification, a batch release does not need a sample round, so the batch clock is set by the deposit. That is the practical value of a closed specification: the schedule becomes a series of deposit dates rather than a series of approvals.

Two scheduling rules follow. First, batches should be spaced at least the length of the applicable band apart, otherwise one batch is still in production when the next is released. Second, a batch that introduces a change should be scheduled against the longer band, not the regular one.

4. MOQ in a Multi-Batch Arrangement

The question that decides whether a framework is workable is how MOQ interacts with batches. The answer is that it does not aggregate.

  • MOQ applies per batch, counted per design, per colourway, per size. A framework that promises 4,000 pieces across four batches does not allow a first batch of 400 unless that batch individually meets the 100-piece minimum for each line it contains.
  • Tiers apply per batch. A 1,000-piece tier price is reached by a batch of 1,000, not by a framework total of 1,000 spread over four releases.
  • Colourway and size count separately. A batch of 400 pieces across four colourways is four 100-piece commitments, not one 400-piece commitment.

This is why a framework should state the expected batch shape rather than only an annual quantity. A framework expressed as “4,000 pieces over the year” can be met with one release of 4,000 or four of 1,000, and only the second shape is usually practical — but the price and the MOQ obligation differ between them.

Fact boundary: No price holding, price-lock period, volume rebate, annual commitment discount or reserved capacity is offered or published here. Each batch is quoted against the confirmed specification and its own quantity and tier at the time of release. A framework fixes how an order is structured; it does not fix a price into the future.

5. What a Batch Release Should Contain

ItemDetail
Batch number and reference to the frameworkSo the batch inherits the fixed clauses
Quantity per design, colourway and sizeThe tier is determined by these, so they have to be explicit
Required delivery windowAn in-hand date rather than an order date
Any deviation from the framework specificationStated explicitly, because it changes the band and may require a sample
Packing and marking confirmationOnly where it differs from the framework
Inspection arrangement for this batchOnly where it differs, for example a third-party booking

A release built this way is short. If a release has to restate the specification, the specification was not closed in the framework.

6. Related Pages

7. Frequently Asked Questions

What is contract supply, and how is it different from a large order?

A framework contract fixes the specification, quantity basis, trade term, payment split and production band, and individual batches are released against it later. A large order is one purchase; a framework is a set of fixed decisions with dates and quantities released against it.

Does MOQ aggregate across batches?

No. MOQ applies per batch, counted per design, per colourway, per size, at the 100, 300, 500 and 1,000 piece tiers. A framework total does not allow a batch below the per-line minimum, and a tier price is reached by a single batch at that quantity.

Is the price fixed for the duration of a framework?

No price holding or price-lock period is offered. Each batch is quoted against the confirmed specification and its own quantity and tier at the time of release. What the framework fixes is how the order is structured, not a future price.

How often can batches be released?

Batches should be spaced at least the applicable production band apart, otherwise one is still in production when the next is released. On a locked specification the regular band is 15–25 days from batch release plus deposit, so roughly monthly releases are feasible for a simple item.

What happens if one batch needs a change?

That batch is not a repeat. It needs a sample round, and if the change touches construction, fabric or print method it moves to the 25–35 day band. Stating the deviation explicitly on the release is what allows the schedule to be set correctly.

What should a batch release contain?

A batch number referencing the framework, the quantity per design, colourway and size, the required delivery window, any deviation from the framework specification, and any packing or inspection change. A release that restates the specification indicates the specification was not closed in the framework.

Discuss a framework

Send the specification you want fixed, the batch shape you expect — how many releases and how much per release — the trade term you work on and the delivery pattern you need. The reply will state which clauses can be fixed, how the batch shape interacts with MOQ, and what each release needs to contain. Initial enquiries are answered within 12 business hours.